ZeRO Optimizer State Sharding
Adam stores two moment estimates per parameter, both in float32. A 7B-parameter model carries 56 GB of optimiser state. ZeRO stage 1 shards that across N ranks; each rank owns 1/N of the optimiser. After the local step the updated parameter shards broadcast back, every rank reconstructs the full model, and the next step begins. The win is a linear memory drop on the largest single allocation in the training stack.
Visual edition planned
This lesson isn’t interactive yet.
It is part of the curriculum and will get the same treatment as Phase 1 — a visual cover, hands-on labs, derivations with numeric checks and a quiz. Until then, the original lesson is the best place to read it:
Part of Phase 19 — Capstone Projects. Use the previous / next cards below to keep browsing the phase.