Verification Gates
The agent does not get to mark its own work as done. A verification gate reads the scope contract, the feedback log, the rule report, and the diff, and answers a single question: is this task actually complete? If the gate says no, the task is not done, no matter what the chat says.
Visual edition planned
This lesson isn’t interactive yet.
It is part of the curriculum and will get the same treatment as Phase 1 — a visual cover, hands-on labs, derivations with numeric checks and a quiz. Until then, the original lesson is the best place to read it:
Part of Phase 14 — Agent Engineering. Use the previous / next cards below to keep browsing the phase.